Losses are separated by factor so the team can act on the real constraint.
Estimated split
Availability88%1,859 m loss
Breakdown44%
Beam change34%
No yarn / material22%
Performance91%1,227 m loss
Yarn breaks39%
Micro-stops36%
Reduced speed25%
Quality98%248 m loss
Start-up waste43%
Holes / lines34%
Tension defects23%
Good Meter Waterfall
Translate OEE into the production quantity the factory can recover.
Theoretical15,493 m
Availability loss-1,859 m
Performance loss-1,227 m
Quality loss-248 m
Good meters+12,159 m
Recoverable this period1,142 mControlled estimate: 37% of availability and performance loss; human validation required.
Order OEE76.8%Active orders only · comparable scopeFirst Good Meter18 minAfter changeover · target 14 minRecurring micro-stops23 events7–42 sec · 3 machinesEnergy / good meter0.42 kWhAdjacent sustainability KPI · not part of OEE
Product × Machine × Shift
Compare OEE only within the same product and operating context.
Context-normalized
Product
Machine
Shift
OEE
Primary signal
Decision
GA002S01
K00
Shift A
83.8%
Within context
Comparable
SM005S05
K01
Shift A
78.5%
Within context
Comparable
SM010S01
K02
Current Shift
78.5%
Within context
Comparable
SM010S01
K03
Current Shift
51.7%
Micro-stops
Review
SM010S01
K04
Current Shift
72.2%
Within context
Comparable
OEE confidenceEstimated · 82%Machine counters and shift calendar are present; good-meter inspection and micro-stop classification still need connection.
VerifiedSpeed, runtime, order and machine
EstimatedIdeal cycle and reason allocation
Needs dataAutomatic defect length and energy meter
Formula changes saved in Merikh FDE are reflected in this prototype result. Loss taxonomy follows textile operating context and remains separate from the formula.View KPI Formula Engine